[{"data":1,"prerenderedAt":385},["ShallowReactive",2],{"guide:zh:work-fulfillment":3},{"id":4,"title":5,"body":6,"description":377,"extension":378,"meta":379,"navigation":380,"path":381,"seo":382,"stem":383,"__hash__":384},"guide_zh/zh/user/work-fulfillment/index.md","工作履行 — 规划、分配与验证现场工作",{"type":7,"value":8,"toc":359},"minimark",[9,13,17,21,32,37,53,57,71,75,89,93,125,128,133,147,152,163,168,183,188,202,205,208,211,216,222,225,228,232,238,244,247,250,254,260,263,268,286,291,302,307,318,321],[10,11,12],"h1",{"id":12},"工作履行",[14,15,16],"p",{},"工作履行涵盖现场作业的完整生命周期——从规划需要完成的工作，到分配团队、授权材料领取、记录完成工作，以及验证质量。系统将规划（版本化，支持离线协作）与执行（实时，为工作人员提供即时确认）分离。",[18,19,20],"h2",{"id":20},"核心工作流",[22,23,28],"pre",{"className":24,"code":26,"language":27},[25],"language-text","任务（版本化）→ 工单（实时）→ 报告（实时）→ 验证（实时）\n   规划              分配          执行          质量检查\n","text",[29,30,26],"code",{"__ignoreMap":31},"",[33,34,36],"h3",{"id":35},"任务-规划阶段版本化","任务 — 规划阶段（版本化）",[38,39,40,44,47,50],"ul",{},[41,42,43],"li",{},"管理员离线设计工作区",[41,45,46],{},"确定资源需求与位置",[41,48,49],{},"支持批量操作（重新设计整个活动）",[41,51,52],{},"带回滚功能的版本/提交工作流",[33,54,56],{"id":55},"工单-分配阶段实时","工单 — 分配阶段（实时）",[38,58,59,62,65,68],{},[41,60,61],{},"向工作人员分配带时间线的任务",[41,63,64],{},"为受保护库存生成 QR 领料码",[41,66,67],{},"即时确认（无需等待版本提交）",[41,69,70],{},"灵活机制：任务量可超目标 10 倍供工人自主选择",[33,72,74],{"id":73},"报告-执行阶段实时","报告 — 执行阶段（实时）",[38,76,77,80,83,86],{},[41,78,79],{},"工作人员记录已完成工作",[41,81,82],{},"自动生成库存消耗交易",[41,84,85],{},"根据实际完成工作量计算支付金额",[41,87,88],{},"支持临时性工作（无需正式任务）",[33,90,92],{"id":91},"验证-质量检查阶段实时显示在报告中","验证 — 质量检查阶段（实时，显示在报告中）",[38,94,95,98,106,109,112,115,118],{},[41,96,97],{},"质检人员核验报告准确性",[41,99,100,101,105],{},"验证以交通灯",[102,103,104],"strong",{},"徽章","的形式显示在报告页面（无独立列表页）",[41,107,108],{},"点击徽章打开验证模态框——无需离开报告即可查看、编辑或创建",[41,110,111],{},"记录发现问题（数量不符、质量缺陷）",[41,113,114],{},"多资源验证（部分通过，部分失败）",[41,116,117],{},"严重性等级：严重、警告、信息",[41,119,120,121,124],{},"移动端主管队列 ",[29,122,123],{},"/m/validations"," 保持不变",[18,126,127],{"id":127},"核心概念",[14,129,130],{},[102,131,132],{},"实时执行：",[38,134,135,138,141,144],{},[41,136,137],{},"工单、报告、验证均实时进行（不支持版本控制）",[41,139,140],{},"工作人员需要即时确认：\"我是否需要执行此任务？\"",[41,142,143],{},"支付链要求已提交数据（不可等待管理员版本提交）",[41,145,146],{},"库存可见性必须实时更新（下一次 QR 码扫描需准确余额）",[14,148,149],{},[102,150,151],{},"多资源任务：",[38,153,154,157,160],{},[41,155,156],{},"单个任务可涉及多种资源（减少地图杂乱）",[41,158,159],{},"示例：门安装 = 1 扇门 + 12 颗螺丝 + 0.5 升粘合剂",[41,161,162],{},"进度按所有资源的平均值计算",[14,164,165],{},[102,166,167],{},"资源目标与预留：",[38,169,170,177,180],{},[41,171,172,173,176],{},"工单显示的 ",[29,174,175],{},"resourceTargets"," 代表待完成目标，而非硬性预留（库存未锁定）",[41,178,179],{},"优先级变更时可灵活调整",[41,181,182],{},"实际分配在 QR 码扫描时执行",[14,184,185],{},[102,186,187],{},"临时性工作：",[38,189,190,193,196,199],{},[41,191,192],{},"报告无需正式任务",[41,194,195],{},"将任务关联到报告是可选操作",[41,197,198],{},"支持计划外维护及问题响应",[41,200,201],{},"仍会生成消耗交易和支付数据",[18,203,204],{"id":204},"进度计算",[33,206,207],{"id":207},"任务层级进度",[14,209,210],{},"任务中所有资源的平均完成情况。",[14,212,213],{},[102,214,215],{},"示例：",[22,217,220],{"className":218,"code":219,"language":27},[25],"任务 A（10 米电缆 + 10 米挖掘）：\n  电缆：完成 5 米 / 10 米 = 50%\n  挖掘：完成 0 米 / 10 米 = 0%\n  进度 = (50% + 0%) / 2 = 25%\n",[29,221,219],{"__ignoreMap":31},[33,223,224],{"id":224},"工单层级进度",[14,226,227],{},"指已分配资源目标的达成进度（非完整任务量）。",[14,229,230],{},[102,231,215],{},[22,233,236],{"className":234,"code":235,"language":27},[25],"工单（任务 A 提供 10 米电缆，任务 B 提供 20 米电缆）：\n  报告数据：任务 A 提供 5 米，任务 B 提供 10 米\n  进度 = (5/10 + 10/20) / 2 = 50%\n",[29,237,235],{"__ignoreMap":31},[14,239,240,243],{},[102,241,242],{},"关键规则："," 按分配量计算，而非任务总量。",[33,245,246],{"id":246},"超额交付处理",[14,248,249],{},"每项任务按 100% 贡献值计算，验证机制确保准确性。",[14,251,252],{},[102,253,215],{},[22,255,258],{"className":256,"code":257,"language":27},[25],"工单（20 米电缆，40 米挖掘）：\n  报告：10 米电缆，60 米挖掘\n  进度 = (10/20 + min(60,40)/40) / 2 = 75%\n",[29,259,257],{"__ignoreMap":31},[18,261,262],{"id":262},"不可变性考量",[14,264,265],{},[102,266,267],{},"工单和报告持久化：",[38,269,270,273,276,279],{},[41,271,272],{},"基础设施拆除后，工单/报告仍保留",[41,274,275],{},"提供工作历史记录（执行内容、时间、负责人）",[41,277,278],{},"支持软删除（可在应用设置中配置保留时长）",[41,280,281,282,285],{},"管理员通过 ",[29,283,284],{},"viewDeleted"," 权限查看软删除记录",[14,287,288],{},[102,289,290],{},"任务版本压缩：",[38,292,293,296,299],{},[41,294,295],{},"任务版本历史记录压缩存储，永不删除",[41,297,298],{},"可回滚至先前任务定义",[41,300,301],{},"空间冲突检测（地理区域重叠）",[14,303,304],{},[102,305,306],{},"交易审计追踪：",[38,308,309,312,315],{},[41,310,311],{},"报告中的消耗交易不可篡改",[41,313,314],{},"无法删除物料使用记录",[41,316,317],{},"更正操作将新增调整交易",[18,319,320],{"id":320},"章节",[38,322,323,331,338,345,352],{},[41,324,325,330],{},[326,327,329],"a",{"href":328},"/guide/work-fulfillment/projects/","项目"," — 将相关工单归组；跟踪活动级别的进度",[41,332,333,337],{},[326,334,336],{"href":335},"/guide/work-fulfillment/tasks/","任务"," — 定义工作区域及其资源需求",[41,339,340,344],{},[326,341,343],{"href":342},"/guide/work-fulfillment/workorders/","工单"," — 将工作分配给具备库存授权的用户",[41,346,347,351],{},[326,348,350],{"href":349},"/guide/work-fulfillment/reports/","报告"," — 记录已完成的工作及资源消耗情况",[41,353,354,358],{},[326,355,357],{"href":356},"/guide/work-fulfillment/validations/","验证"," — 以报告页面徽章形式管理的质量控制",{"title":31,"searchDepth":360,"depth":360,"links":361},2,[362,369,370,375,376],{"id":20,"depth":360,"text":20,"children":363},[364,366,367,368],{"id":35,"depth":365,"text":36},3,{"id":55,"depth":365,"text":56},{"id":73,"depth":365,"text":74},{"id":91,"depth":365,"text":92},{"id":127,"depth":360,"text":127},{"id":204,"depth":360,"text":204,"children":371},[372,373,374],{"id":207,"depth":365,"text":207},{"id":224,"depth":365,"text":224},{"id":246,"depth":365,"text":246},{"id":262,"depth":360,"text":262},{"id":320,"depth":360,"text":320},"管理现场作业的完整生命周期：规划资源需求任务、通过 QR 码库存授权分配团队、在报告中记录完成工作，以及通过主管验证进行质量控制。","md",{},true,"/zh/user/work-fulfillment",{"title":5,"description":377},"zh/user/work-fulfillment/index","4wz5cykj8Hih5GViAQgBJACCSQsv2AMeguxMu0MIxIo",1780539281452]