[{"data":1,"prerenderedAt":407},["ShallowReactive",2],{"guide:zh:work-fulfillment/activities":3},{"id":4,"title":5,"body":6,"description":399,"extension":400,"meta":401,"navigation":402,"path":403,"seo":404,"stem":405,"__hash__":406},"guide_zh/zh/user/work-fulfillment/activities.md","活动 — 定义施工队执行的工作类型",{"type":7,"value":8,"toc":390},"minimark",[9,13,49,56,60,71,87,94,97,102,137,142,162,169,171,182,242,257,260,263,277,280,283,293,298,322,327,341,344,347,372],[10,11,12],"h1",{"id":12},"活动",[14,15,16,17,21,22,27,28,31,32,36,37,40,41,44,45,48],"p",{},"活动是描述",[18,19,20],"strong",{},"施工团队做什么","的目录条目，就像",[23,24,26],"a",{"href":25},"/guide/inventory-management/resources/","资源","描述",[18,29,30],{},"施工团队用什么","一样。 资源是一米长的电缆或一个接线盒；而活动则是",[33,34,35],"em",{},"拉","那根电缆、",[33,38,39],{},"接","那根光纤、",[33,42,43],{},"挖","一条沟渠，或是",[33,46,47],{},"检查","一段跨距。 只需定义一次活动，它即可在任何工作单中被选中，并以其自身的单位（接头、米、小时、跨距）进行计量。",[14,50,51,52,55],{},"在 §193 工作模型重构中，活动作为与资源对称的一级注册表被引入。此前，施工队完成的工作仅以自由文本形式存在于每个工作单中——无法汇总、比较或估价。如今，工作的 ",[33,53,54],{},"类型"," 已成为结构化、可重用的记录。",[57,58,59],"h2",{"id":59},"活动的定位",[61,62,67],"pre",{"className":63,"code":65,"language":66},[64],"language-text","任务  （计划工作单元 — 几何信息 + 所需内容）\n  ├── 资源   → 消耗的材料/设备/劳动力  （目录：资源）\n  └── 工作单  （将任务分配给施工队）\n        └── 活动行  → 实际完成的工作（目录：活动）\n","text",[68,69,65],"code",{"__ignoreMap":70},"",[14,72,73,75,76,78,79,82,83,86],{},[18,74,26],{},"回答*“这项工作消耗了哪些材料？”*，并作为资源行存在于任务中。\n",[18,77,12],{},"回答 ",[33,80,81],{},"“正在进行什么工作？”","，并作为活动行存在于 ",[18,84,85],{},"工作单"," 中——既可以是本目录中已注册的活动，也可以是直接输入的临时一次性活动。",[14,88,89,90,93],{},"两者均为",[18,91,92],{},"可选","。一个任务不必声明任何资源，一个工作单也不必指定已注册的活动。当结构化追踪能发挥作用时使用它们；对于简单或一次性工作，则可省略。",[57,95,96],{"id":96},"活动字段",[14,98,99],{},[18,100,101],{},"基本信息",[103,104,105,112,117],"ul",{},[106,107,108,111],"li",{},[18,109,110],{},"名称"," — 描述性工作类型（例如，“熔接”、“光纤拉入”、“定向钻进”）",[106,113,114,116],{},[18,115,27],{}," — 方法说明、验收标准或安全注意事项",[106,118,119,122,123,126,127,126,130,126,133,136],{},[18,120,121],{},"计量单位"," — 该活动可追踪的计量单位，其中一个被标记为默认单位（例如 ",[33,124,125],{},"熔接点","、",[33,128,129],{},"米",[33,131,132],{},"小时",[33,134,135],{},"跨距","）",[14,138,139],{},[18,140,141],{},"组织",[103,143,144,150,156],{},[106,145,146,149],{},[18,147,148],{},"标签"," — 用于筛选和分组的自由格式标签（例如，“光纤”、“土建”、“质量保证”）",[106,151,152,155],{},[18,153,154],{},"属性"," — 任意键值元数据，具备与资源相同的灵活“袋”功能",[106,157,158,161],{},[18,159,160],{},"附件"," — 参考文件：施工方法说明、技术规格表、预期结果的照片",[14,163,164,165,168],{},"活动刻意不包含",[18,166,167],{},"库存、存货和提货政策","——这些属于资源的范畴。活动是对工作的定义，而非实物持有。这正是将两个注册表分开的核心意义：材料通过库存流动；工作则通过报告和付款流程推进。",[57,170,121],{"id":121},[14,172,173,174,177,178,181],{},"与资源类似，活动采用统一的单位模型：一个单一的",[18,175,176],{},"单位","列表，其中每个条目都有名称，且有一个被标记为",[18,179,180],{},"主要","（即选择活动时显示的默认单位）。请选择与工作自然计数和支付方式相匹配的单位：",[183,184,185,199],"table",{},[186,187,188],"thead",{},[189,190,191,194,197],"tr",{},[192,193,12],"th",{},[192,195,196],{},"合理单位",[192,198,180],{},[200,201,202,212,222,231],"tbody",{},[189,203,204,208,210],{},[205,206,207],"td",{},"熔接",[205,209,125],{},[205,211,125],{},[189,213,214,217,220],{},[205,215,216],{},"光缆拉纤",[205,218,219],{},"米、英尺",[205,221,129],{},[189,223,224,227,229],{},[205,225,226],{},"定向钻进",[205,228,129],{},[205,230,129],{},[189,232,233,236,239],{},[205,234,235],{},"电杆检查",[205,237,238],{},"电杆、小时",[205,240,241],{},"电杆",[14,243,244,245,248,249,252,253,256],{},"当工单选择该活动时，计划员需以其中一种单位输入",[18,246,247],{},"数量","（工单上的",[18,250,251],{},"活动数量","和",[18,254,255],{},"活动计量单位","）。 正是这种结构化的单位组合，使得活动工作量可在整个项目中进行汇总，并用于支付计算——这与旧式的自由文本描述不同。",[57,258,259],{"id":259},"注册活动与临时活动",[14,261,262],{},"工单的活动行可通过两种方式填写：",[103,264,265,271],{},[106,266,267,270],{},[18,268,269],{},"注册"," — 从本目录中选择一项活动。 可重复使用、命名规范，能在不同工单和项目间清晰汇总。适用于任何需要重复执行的工作类型。",[106,272,273,276],{},[18,274,275],{},"临时"," — 直接在工单上输入一次性活动，无需创建目录条目。适用于真正独特或紧急且绝不会重复的工作。",[14,278,279],{},"此建议与资源管理原则一致：若发现自己反复输入相同的临时活动，请将其升级为已注册活动，以便进行汇总和计价。",[57,281,282],{"id":282},"创建活动",[14,284,285,288,289,292],{},[18,286,287],{},"所需权限："," ",[68,290,291],{},"activitiesCreate"," 管理员权限",[14,294,295],{},[18,296,297],{},"操作流程：",[299,300,301,304,310,313,316,319],"ol",{},[106,302,303],{},"导航至管理 → 活动",[106,305,306,307],{},"点击 ",[18,308,309],{},"添加活动",[106,311,312],{},"填写基本信息（名称、描述）",[106,314,315],{},"添加计量单位并标记一个为主单位",[106,317,318],{},"如有需要，添加标签并附上参考文件",[106,320,321],{},"保存",[14,323,324],{},[18,325,326],{},"最佳实践：",[103,328,329,332,335,338],{},[106,330,331],{},"根据工作动词命名（如“接驳”、“拉线”、“钻孔”、“检查”），使目录呈现为动作列表",[106,333,334],{},"计量单位应仅保留施工队实际使用的少数几种——一个主单位，最多几个备选单位",[106,336,337],{},"按专业领域（光缆/土木/质量保证）添加标签，以便计划人员能快速筛选",[106,339,340],{},"仅将“临时”标记用于真正的一次性工作；将任何重复性工作设为常规",[57,342,343],{"id":343},"活动的使用",[14,345,346],{},"活动出现在：",[103,348,349,354,360,366],{},[106,350,351,353],{},[18,352,85],{}," —— 结构化的活动行（已注册活动或临时活动）及其数量和单位",[106,355,356,359],{},[18,357,358],{},"报告"," —— 施工队针对分配的活动所记录的工作",[106,361,362,365],{},[18,363,364],{},"项目汇总"," —— 该项目所有工作单中同类活动的总计",[106,367,368,371],{},[18,369,370],{},"付款"," —— 活动量 × 单价，其中工作量（而非仅材料）决定付款金额",[14,373,12,374,377,378,126,380,384,385,389],{},[18,375,376],{},"不","涉及库存。 它们定义并汇总工作本身；",[23,379,26],{"href":25},[23,381,383],{"href":382},"/guide/inventory-management/stock-items/","库存项目"," 和 ",[23,386,388],{"href":387},"/guide/inventory-management/transactions/","交易"," 负责处理工作所消耗的材料。",{"title":70,"searchDepth":391,"depth":391,"links":392},2,[393,394,395,396,397,398],{"id":59,"depth":391,"text":59},{"id":96,"depth":391,"text":96},{"id":121,"depth":391,"text":121},{"id":259,"depth":391,"text":259},{"id":282,"depth":391,"text":282},{"id":343,"depth":391,"text":343},"活动是工作类型（如接线、拉线、挖掘、检查等）的目录，工作单会引用这些活动。它们是资源在工作层面的对应概念：只需定义一次活动，即可在任何工作单中选用，并拥有其专属的计量单位。","md",{},true,"/zh/user/work-fulfillment/activities",{"title":5,"description":399},"zh/user/work-fulfillment/activities","tO5BJ6WWCeO938ijWNxVuWCbgp69yjDk9bHsGfxUL4I",1781607701553]