[{"data":1,"prerenderedAt":452},["ShallowReactive",2],{"guide:zh:work-fulfillment/projects":3},{"id":4,"title":5,"body":6,"description":444,"extension":445,"meta":446,"navigation":447,"path":448,"seo":449,"stem":450,"__hash__":451},"guide_zh/zh/user/work-fulfillment/projects.md","项目 — 活动规划与进度跟踪",{"type":7,"value":8,"toc":428},"minimark",[9,13,17,22,25,38,44,60,63,74,144,147,150,199,202,205,233,236,239,242,248,251,255,258,269,272,275,298,301,304,307,315,326,329,345,348,351,401,404,410,422],[10,11,12],"h1",{"id":12},"项目",[14,15,16],"p",{},"项目将相关工单归组，并跟踪朝着定义目标的整体进度。随着项目内的工单和任务完成，项目会自动经历生命周期各阶段。",[18,19,21],"h2",{"id":20},"什么是项目","什么是项目？",[14,23,24],{},"项目是一个命名的任务集合（不要与工单任务混淆——请参阅下方的区别说明）。以下情况适合使用项目：",[26,27,28,32,35],"ul",{},[29,30,31],"li",{},"跨多个工单跟踪相关工作活动",[29,33,34],{},"向利益相关者汇报总体完成情况",[29,36,37],{},"将相关任务归组并监控整体进度",[14,39,40],{},[41,42,43],"strong",{},"项目与工单的区别：",[26,45,46,51,57],{},[29,47,48,50],{},[41,49,12],{},"是规划容器（活动）",[29,52,53,56],{},[41,54,55],{},"工单","是分配给个人或团队的具体工作",[29,58,59],{},"工单从项目中接受任务；单个项目任务可能跨越多个工单",[18,61,62],{"id":62},"项目生命周期",[64,65,70],"pre",{"className":66,"code":68,"language":69},[67],"language-text","已创建 → 活跃（已添加任务）→ 进行中（第一个任务已开始）→ 已完成 → 已关闭\n","text",[71,72,68],"code",{"__ignoreMap":73},"",[75,76,77,90],"table",{},[78,79,80],"thead",{},[81,82,83,87],"tr",{},[84,85,86],"th",{},"状态",[84,88,89],{},"触发时机",[91,92,93,104,114,124,134],"tbody",{},[81,94,95,101],{},[96,97,98],"td",{},[71,99,100],{},"draft",[96,102,103],{},"项目已创建但尚未添加任务",[81,105,106,111],{},[96,107,108],{},[71,109,110],{},"active",[96,112,113],{},"至少存在一个任务",[81,115,116,121],{},[96,117,118],{},[71,119,120],{},"in_progress",[96,122,123],{},"至少有一个任务已开始",[81,125,126,131],{},[96,127,128],{},[71,129,130],{},"completed",[96,132,133],{},"项目经理在工作完成时手动设置状态",[81,135,136,141],{},[96,137,138],{},[71,139,140],{},"closed",[96,142,143],{},"管理员手动关闭（归档）",[14,145,146],{},"项目状态由项目经理手动设置。项目详情页上的进度指标显示已报告的工作量，帮助项目经理决定何时将项目标记为完成。",[18,148,149],{"id":149},"创建项目",[151,152,153,159,165,194],"ol",{},[29,154,155,156],{},"导航至",[41,157,158],{},"履行 → 项目",[29,160,161,162],{},"点击",[41,163,164],{},"新建项目",[29,166,167,168],{},"填写以下内容：\n",[26,169,170,176,182,188],{},[29,171,172,175],{},[41,173,174],{},"名称"," — 简短、具描述性",[29,177,178,181],{},[41,179,180],{},"描述"," — 范围、目标、备注",[29,183,184,187],{},[41,185,186],{},"受指派人"," — 负责的团队成员或经理",[29,189,190,193],{},[41,191,192],{},"截止日期"," — 目标完成日期（可选）",[29,195,161,196],{},[41,197,198],{},"保存",[18,200,201],{"id":201},"向项目添加任务",[14,203,204],{},"项目任务定义构成项目的工作单元。每个任务跟踪自己的完成状态。",[151,206,207,210,216],{},[29,208,209],{},"打开项目",[29,211,161,212,215],{},[41,213,214],{},"添加任务","（或从任务页面将现有任务拖入项目）",[29,217,218,219],{},"填写任务详情：\n",[26,220,221,224,227,230],{},[29,222,223],{},"名称和描述",[29,225,226],{},"资源需求（材料、人工、设备）",[29,228,229],{},"位置（如适用，指定地图几何图形）",[29,231,232],{},"预计工作量",[14,234,235],{},"添加到项目的任务与履行 → 任务页面上的顶层工作任务不同。项目任务的范围限定在项目内，跟踪项目级别的完成情况，而工单任务定义现场工作人员每天执行的具体工作。",[18,237,238],{"id":238},"进度跟踪",[14,240,241],{},"项目详情页以百分比显示整体进度：",[64,243,246],{"className":244,"code":245,"language":69},[67],"项目进度 = 已完成任务数 / 总任务数 × 100%\n",[71,247,245],{"__ignoreMap":73},[14,249,250],{},"项目列表页面为每个项目显示实时进度条。进度数据也可供外部仪表板和报告工具使用——请联系系统管理员了解集成详情。",[252,253,254],"h3",{"id":254},"深入查看",[14,256,257],{},"在项目页面，您可以：",[26,259,260,263,266],{},[29,261,262],{},"查看所有任务及其各自的状态",[29,264,265],{},"按状态过滤任务（待处理、进行中、已完成）",[29,267,268],{},"点击任务以打开其详情和关联工单",[18,270,271],{"id":271},"将项目任务分配给工单",[14,273,274],{},"项目任务可以被一个或多个工单引用。这是将工作分发给现场团队的方式：",[151,276,277,283,286,293,296],{},[29,278,279,280,282],{},"打开",[41,281,55],{},"页面",[29,284,285],{},"创建新工单（或编辑现有工单）",[29,287,288,289,292],{},"在",[41,290,291],{},"可用任务","字段中，拖动或选择项目任务",[29,294,295],{},"分配工作人员并设置时间线",[29,297,198],{},[14,299,300],{},"当工作人员针对引用项目任务的工单提交报告时，项目任务的完成状态会自动更新。",[18,302,303],{"id":303},"从项目中移除任务",[14,305,306],{},"从项目中移除任务时：",[26,308,309,312],{},[29,310,311],{},"系统检查任务是否仍被活跃工单引用，如果是则记录警告",[29,313,314],{},"任务不会从系统中删除——仅移除其与项目的关联",[14,316,317,318,321,322,325],{},"要完全停用任务，请从",[41,319,320],{},"履行 → 任务","中删除（需要 ",[71,323,324],{},"featureDelete"," 权限）。",[18,327,328],{"id":328},"删除项目",[151,330,331,333,342],{},[29,332,209],{},[29,334,161,335,338,339,341],{},[41,336,337],{},"删除","（需要 ",[71,340,324],{}," 权限）",[29,343,344],{},"确认",[14,346,347],{},"删除是软删除——项目从所有视图中隐藏，但为审计目的而保留。引用该项目的工单和任务不受影响。删除操作记录在审计追踪中。",[18,349,350],{"id":350},"权限",[75,352,353,363],{},[78,354,355],{},[81,356,357,360],{},[84,358,359],{},"操作",[84,361,362],{},"所需权限",[91,364,365,373,383,391],{},[81,366,367,370],{},[96,368,369],{},"查看项目",[96,371,372],{},"已认证用户",[81,374,375,378],{},[96,376,377],{},"创建/编辑项目",[96,379,380],{},[71,381,382],{},"featureCreate",[81,384,385,387],{},[96,386,328],{},[96,388,389],{},[71,390,324],{},[81,392,393,396],{},[96,394,395],{},"查看软删除项目",[96,397,398],{},[71,399,400],{},"viewDeleted",[18,402,403],{"id":403},"提示",[14,405,406,409],{},[41,407,408],{},"将项目用于活动，而非单个工作。"," 单次安装或维修属于工单范畴。跨 50 根电杆历时数周的光纤推进工程属于项目范畴。",[14,411,412,415,416,418,419,421],{},[41,413,414],{},"项目不会自动完成。"," 当进度指标显示所有工作已完成时，项目经理进行审查并手动将项目标记为 ",[71,417,130],{},"。完成计费和报告后，将其设置为 ",[71,420,140],{},"。",[14,423,424,427],{},[41,425,426],{},"进度报告。"," 项目完成数据——包括完成百分比、任务数量和截止日期——可供外部报告工具或仪表板使用。请联系系统管理员设置此集成。",{"title":73,"searchDepth":429,"depth":429,"links":430},2,[431,432,433,434,435,439,440,441,442,443],{"id":20,"depth":429,"text":21},{"id":62,"depth":429,"text":62},{"id":149,"depth":429,"text":149},{"id":201,"depth":429,"text":201},{"id":238,"depth":429,"text":238,"children":436},[437],{"id":254,"depth":438,"text":254},3,{"id":271,"depth":429,"text":271},{"id":303,"depth":429,"text":303},{"id":328,"depth":429,"text":328},{"id":350,"depth":429,"text":350},{"id":403,"depth":429,"text":403},"将相关工单归入一个命名项目，跟踪活动级别的进度，向利益相关者汇报总体完成情况，并管理多团队推进工作。","md",{},true,"/zh/user/work-fulfillment/projects",{"title":5,"description":444},"zh/user/work-fulfillment/projects","LuSFkmAbqgwmColUxh_80py_NjYDqtKEzC6FSdyyFEE",1780539291238]