[{"data":1,"prerenderedAt":992},["ShallowReactive",2],{"guide:zh:work-fulfillment/reports":3},{"id":4,"title":5,"body":6,"description":984,"extension":985,"meta":986,"navigation":987,"path":988,"seo":989,"stem":990,"__hash__":991},"guide_zh/zh/user/work-fulfillment/reports.md","报告 — 记录已完成的现场工作",{"type":7,"value":8,"toc":968},"minimark",[9,13,17,21,32,38,78,83,97,102,116,119,122,174,180,184,190,195,209,213,224,227,231,234,275,280,301,305,311,316,330,333,336,341,360,365,379,384,398,401,411,415,465,471,482,488,502,505,508,513,524,529,542,548,559,562,567,593,598,618,621,624,629,635,640,646,651,657,660,663,670,690,701,710,713,718,738,744,782,787,800,803,808,819,824,835,840,854,859,870,875,886,891,905,908,914,932,938,952,957],[10,11,12],"h1",{"id":12},"报告",[14,15,16],"p",{},"报告是现场工作人员记录已完成工作的凭证。工作人员完成安装、维修或检查后，提交报告，记录工作内容、所用材料、施工地点及照片或备注。提交报告会自动生成库存消耗交易并纳入付款计算——无需额外填写纸质文件。",[18,19,20],"h2",{"id":20},"报告结构",[14,22,23,28],{},[24,25],"img",{"alt":26,"src":27},"报告列表","/guide/work-fulfillment/reports-list.png",[29,30,31],"em",{},"报告页面展示现场执行记录，包含消耗情况和状态",[14,33,34],{},[35,36,37],"strong",{},"核心字段：",[39,40,41,48,54,60,66,72],"ul",{},[42,43,44,47],"li",{},[35,45,46],{},"名称"," — 报告标题或摘要",[42,49,50,53],{},[35,51,52],{},"描述"," — 详细备注、观察结果及遇到的问题",[42,55,56,59],{},[35,57,58],{},"提交人"," — 提交报告的用户",[42,61,62,65],{},[35,63,64],{},"报告日期"," — 工作执行时间",[42,67,68,71],{},[35,69,70],{},"工单"," — 可选的父级工单关联",[42,73,74,77],{},[35,75,76],{},"几何对象"," — 工作执行位置（点、线或多边形）",[14,79,80],{},[35,81,82],{},"工作记录：",[39,84,85,91],{},[42,86,87,90],{},[35,88,89],{},"已完成工作"," — 已消耗资源及已完成任务的列表",[42,92,93,96],{},[35,94,95],{},"消耗来源"," — 哪些库存项已耗尽（触发交易）",[14,98,99],{},[35,100,101],{},"媒体：",[39,103,104,110],{},[42,105,106,109],{},[35,107,108],{},"照片"," — 施工前后的对比图像及遇到的问题",[42,111,112,115],{},[35,113,114],{},"附件"," — 文件、图表、认证文件",[18,117,118],{"id":118},"已完成工作结构",[14,120,121],{},"\"已完成工作\"列表中的每条记录对应一种类型的工作：",[123,124,125,138],"table",{},[126,127,128],"thead",{},[129,130,131,135],"tr",{},[132,133,134],"th",{},"字段",[132,136,137],{},"说明",[139,140,141,150,158,166],"tbody",{},[129,142,143,147],{},[144,145,146],"td",{},"资源",[144,148,149],{},"完成的工作（例如 Cat6 电缆、接线盒、电工）",[129,151,152,155],{},[144,153,154],{},"数量",[144,156,157],{},"完成量（例如 45、8、3.5）",[129,159,160,163],{},[144,161,162],{},"计量单位",[144,164,165],{},"数量对应的单位（例如米、个、小时）",[129,167,168,171],{},[144,169,170],{},"任务",[144,172,173],{},"可选 — 该工作对应的任务",[14,175,176,179],{},[35,177,178],{},"示例："," 工作人员报告安装了 45 米 Cat6 电缆、8 个接线盒以及 3.5 小时电工工时，全部关联至同一任务。",[18,181,183],{"id":182},"临时报告无正式任务","临时报告（无正式任务）",[14,185,186,187,189],{},"每条已完成工作记录中的",[35,188,170],{},"字段为可选项——支持计划外工作：",[14,191,192],{},[35,193,194],{},"使用场景：",[39,196,197,200,203,206],{},[42,198,199],{},"紧急维修（设备故障、事故处理）",[42,201,202],{},"客户服务呼叫（非计划现场访问）",[42,204,205],{},"其他工作中发现的维护需求",[42,207,208],{},"探索性工作（勘察、评估）",[14,210,211],{},[35,212,178],{},[214,215,220],"pre",{"className":216,"code":218,"language":219},[217],"language-text","报告：\"紧急光纤维修 - 风暴损坏\"\n已完成工作：[\n  { resource: \"Fiber Cable\", volume: 20, uom: \"meters\" }\n  // 无关联任务 - 这是计划外的紧急工作\n]\n消耗来源：[\n  { stockItemId: truck_fiber_id, resource: \"Fiber Cable\", volume: 20, uom: \"meters\" }\n]\n","text",[221,222,218],"code",{"__ignoreMap":223},"",[14,225,226],{},"即使没有正式的任务分配，系统仍会创建消耗交易、追踪材料成本并计算付款。",[18,228,230],{"id":229},"消耗来源自动交易","消耗来源（自动交易）",[14,232,233],{},"\"消耗来源\"列表在报告提交时触发自动库存扣减：",[123,235,236,244],{},[126,237,238],{},[129,239,240,242],{},[132,241,134],{},[132,243,137],{},[139,245,246,254,261,268],{},[129,247,248,251],{},[144,249,250],{},"库存项",[144,252,253],{},"从哪个库存项扣减（例如工人卡车上的电缆存货）",[129,255,256,258],{},[144,257,146],{},[144,259,260],{},"消耗的资源类型",[129,262,263,265],{},[144,264,154],{},[144,266,267],{},"消耗多少",[129,269,270,272],{},[144,271,162],{},[144,273,274],{},"数量对应的单位",[14,276,277],{},[35,278,279],{},"工作流程：",[281,282,283,286,289,292,295,298],"ol",{},[42,284,285],{},"工作人员提交含消耗来源条目的报告",[42,287,288],{},"系统验证每个库存项的可用量",[42,290,291],{},"自动创建消耗交易",[42,293,294],{},"交易与本报告关联",[42,296,297],{},"库存项余量减少",[42,299,300],{},"若库存不足 → 拒绝报告，或提示工作人员进行部分消耗",[14,302,303],{},[35,304,178],{},[214,306,309],{"className":307,"code":308,"language":219},[217],"消耗来源：[\n  { stockItemId: johns_truck_cable, resource: \"Cat6 Cable\", volume: 45, uom: \"meters\" },\n  { stockItemId: johns_truck_boxes, resource: \"Junction Boxes\", volume: 8, uom: \"units\" }\n]\n\n结果：\n  - 创建了 2 笔消耗交易\n  - 约翰的卡车库存减少 45 米电缆和 8 个接线盒\n  - 交易与本报告关联\n  - 付款计算拥有可靠的消耗数据\n",[221,310,308],{"__ignoreMap":223},[14,312,313],{},[35,314,315],{},"优势：",[39,317,318,321,324,327],{},[42,319,320],{},"库存始终准确（未记录消耗量不得提交工单）",[42,322,323],{},"交易审计追踪自动生成",[42,325,326],{},"防止\"虚耗\"（提交报告时库存未变动）",[42,328,329],{},"按实际用料付款",[18,331,332],{"id":332},"报告验证",[14,334,335],{},"报告提交时，系统进行以下验证：",[14,337,338],{},[35,339,340],{},"库存可用性：",[39,342,343,346],{},[42,344,345],{},"检查每条消耗来源条目",[42,347,348,349],{},"若某库存项余量不足 → 可选方案：\n",[281,350,351,354,357],{},[42,352,353],{},"拒绝整个报告（显示错误信息）",[42,355,356],{},"提示部分消耗（减少报告数量）",[42,358,359],{},"允许负余额（带警告提示——需后续调整交易）",[14,361,362],{},[35,363,364],{},"工作量与消耗量匹配：",[39,366,367,370,373,376],{},[42,368,369],{},"若消耗来源与已完成工作量不符则发出警告",[42,371,372],{},"示例：报告完成 50 米电缆施工，实际仅消耗 30 米",[42,374,375],{},"不阻止提交（工作人员可能使用了个人材料）",[42,377,378],{},"标记为需验证审核",[14,380,381],{},[35,382,383],{},"几何验证：",[39,385,386,389,392,395],{},[42,387,388],{},"点必须具有有效坐标",[42,390,391],{},"线必须至少包含 2 个点",[42,393,394],{},"多边形必须闭合（起始点 = 终点）",[42,396,397],{},"作业位置必须在任务几何范围的合理距离内（可配置）",[18,399,400],{"id":400},"创建报告",[14,402,403,406,407,410],{},[35,404,405],{},"所需权限："," ",[221,408,409],{},"reportsCreate"," 管理员权限（或自助报告权限）",[14,412,413],{},[35,414,279],{},[281,416,417,420,423,426,429,443,456,459,462],{},[42,418,419],{},"导航至【履约】→【报告】",[42,421,422],{},"点击\"添加报告\"",[42,424,425],{},"填写基本信息（名称、描述、日期）",[42,427,428],{},"关联工单（可选——用于进度跟踪）",[42,430,431,432],{},"添加已完成工作条目：\n",[39,433,434,437,440],{},[42,435,436],{},"选择资源",[42,438,439],{},"输入完成量",[42,441,442],{},"关联任务（可选）",[42,444,445,446],{},"添加消耗来源条目：\n",[39,447,448,451,453],{},[42,449,450],{},"选择库存项（通常为工作人员的个人站点）",[42,452,436],{},[42,454,455],{},"输入消耗量",[42,457,458],{},"设置几何对象（工作执行位置）",[42,460,461],{},"上传照片/附件",[42,463,464],{},"提交 → 交易自动生成",[14,466,467,470],{},[35,468,469],{},"从工单快速创建报告：","\n在工单详情视图中打开预填表单：",[39,472,473,476,479],{},[42,474,475],{},"工单、分配对象、可用任务自动填充",[42,477,478],{},"基于资源目标提供建议消耗量",[42,480,481],{},"工作人员调整实际值后提交",[14,483,484,487],{},[35,485,486],{},"移动端创建报告：","\n简化的移动界面：",[39,489,490,493,496,499],{},[42,491,492],{},"相机集成，用于拍摄照片",[42,494,495],{},"GPS 自动捕获地理位置",[42,497,498],{},"语音转文字，用于描述输入",[42,500,501],{},"最小化必填字段",[18,503,504],{"id":504},"报告对进度的贡献",[14,506,507],{},"报告会更新任务和工单的进度：",[14,509,510],{},[35,511,512],{},"任务进度：",[39,514,515,518,521],{},[42,516,517],{},"汇总该任务所有报告的已完成工作量",[42,519,520],{},"除以任务资源需求量",[42,522,523],{},"每项资源上限为 100%",[14,525,526],{},[35,527,528],{},"工单进度：",[39,530,531,534,537,539],{},[42,532,533],{},"汇总本工单所有报告的已完成工作量",[42,535,536],{},"除以工单资源目标值",[42,538,523],{},[42,540,541],{},"计算所有目标的平均值",[14,543,544,547],{},[35,545,546],{},"超额交付：","\n工作人员可报告超出分配量的工作：",[39,549,550,553,556],{},[42,551,552],{},"有助于推进任务进度（加速任务完成）",[42,554,555],{},"工单进度上限为 100%（工作人员超额完成目标）",[42,557,558],{},"验证环节审核超额交付内容（核查准确性）",[18,560,561],{"id":561},"报告详情视图",[14,563,564],{},[35,565,566],{},"显示信息：",[39,568,569,572,575,578,581,584,587,590],{},[42,570,571],{},"基本信息（名称、描述、日期、上报人）",[42,573,574],{},"工单关联（如适用）",[42,576,577],{},"已完成工作列表及任务引用",[42,579,580],{},"消耗来源列表及库存项链接",[42,582,583],{},"消耗交易记录（自动生成）",[42,585,586],{},"照片及附件",[42,588,589],{},"地图上的几何对象",[42,591,592],{},"验证结果（如已执行质量控制）",[14,594,595],{},[35,596,597],{},"可用操作：",[39,599,600,603,606,609,612,615],{},[42,601,602],{},"编辑报告（验证前）",[42,604,605],{},"上传额外照片",[42,607,608],{},"添加评论/备注",[42,610,611],{},"请求验证",[42,613,614],{},"查看消耗交易记录",[42,616,617],{},"打印报告（PDF 导出）",[18,619,620],{"id":620},"付款计算",[14,622,623],{},"报告驱动付款工作流：",[14,625,626],{},[35,627,628],{},"劳务付款：",[214,630,633],{"className":631,"code":632,"language":219},[217],"已完成工作：\n  - 电工：3.5 小时\n  \n付款金额 = 3.5 小时 × 小时费率\n",[221,634,632],{"__ignoreMap":223},[14,636,637],{},[35,638,639],{},"材料成本：",[214,641,644],{"className":642,"code":643,"language":219},[217],"消耗来源：\n  - Cat6 电缆：45 米 × $2/米 = $90\n  - 接线盒：8 个 × $15/个 = $120\n  \n总材料成本 = $210\n",[221,645,643],{"__ignoreMap":223},[14,647,648],{},[35,649,650],{},"总工作成本：",[214,652,655],{"className":653,"code":654,"language":219},[217],"人工 + 材料 = 支付给工人的报酬 + 材料成本 = 总成本\n",[221,656,654],{"__ignoreMap":223},[14,658,659],{},"交易审计追踪提供可靠的材料成本（无法虚报消耗量——与实际库存消耗挂钩）。",[18,661,662],{"id":662},"报告列表中的验证徽章",[14,664,665,666,669],{},"验证现已直接在报告页面以交通灯徽章的形式呈现——您无需再导航至独立的 ",[221,667,668],{},"/fulfillment/validations"," 页面来查看或创建验证。每条报告行包含：",[39,671,672,683],{},[42,673,674,675,678,679,682],{},"独立列中的",[35,676,677],{},"聚合验证徽章","，显示最严重的状态及数量（例如 ",[221,680,681],{},"FAILED · 3","）。悬停可查看各状态明细。",[42,684,685,686,689],{},"展开报告后显示的",[35,687,688],{},"按状态分组徽章行","，每条验证对应一个徽章。",[14,691,692,693,696,697,700],{},"点击任意徽章可打开 ",[221,694,695],{},"ValidationEditModal"," —— 一个全屏覆盖层，无需离开报告即可查看、编辑或创建验证。模态框中的",[35,698,699],{},"提交","按钮会将报告和验证的编辑原子性地一同提交。",[14,702,703,704,709],{},"详见",[705,706,708],"a",{"href":707},"/guide/work-fulfillment/validations/","验证","完整说明。",[18,711,712],{"id":712},"筛选报告",[14,714,715],{},[35,716,717],{},"预置筛选器：",[39,719,720,726,732],{},[42,721,722,725],{},[35,723,724],{},"由我提交"," — 您提交的报告",[42,727,728,731],{},[35,729,730],{},"待验证"," — 没有任何验证的报告（灰色徽章）",[42,733,734,737],{},[35,735,736],{},"近期"," — 过去 7 天内的报告",[14,739,740,743],{},[35,741,742],{},"验证状态筛选：","\n报告列表支持验证状态筛选，选项如下：",[39,745,746,752,758,764,770,776],{},[42,747,748,751],{},[221,749,750],{},"all"," — 所有报告（默认）",[42,753,754,757],{},[221,755,756],{},"none"," — 没有任何验证的报告",[42,759,760,763],{},[221,761,762],{},"any"," — 至少有一条验证的报告",[42,765,766,769],{},[221,767,768],{},"failed"," — 至少有一条失败验证的报告",[42,771,772,775],{},[221,773,774],{},"revision"," — 至少有一条 needs-revision 验证的报告",[42,777,778,781],{},[221,779,780],{},"passed"," — 所有验证均通过的报告",[14,783,784],{},[35,785,786],{},"自定义筛选：",[39,788,789,792,795,797],{},[42,790,791],{},"日期范围",[42,793,794],{},"由特定用户提交",[42,796,70],{},[42,798,799],{},"任务引用",[18,801,802],{"id":802},"最佳实践",[14,804,805],{},[35,806,807],{},"准确的消耗报告：",[39,809,810,813,816],{},[42,811,812],{},"报告实际使用的材料（非估算值）",[42,814,815],{},"使用个人站点中的库存项（证明材料来源）",[42,817,818],{},"记录超额消耗（说明为何需要更多材料）",[14,820,821],{},[35,822,823],{},"及时提交：",[39,825,826,829,832],{},[42,827,828],{},"当日完成工作，当日提交报告",[42,830,831],{},"GPS 定位与时间戳确保责任可追溯",[42,833,834],{},"记忆新鲜 = 细节更准确",[14,836,837],{},[35,838,839],{},"照片记录：",[39,841,842,845,848,851],{},[42,843,844],{},"施工前照片（现场状况）",[42,846,847],{},"施工中照片（工程进行中）",[42,849,850],{},"施工后照片（安装完成）",[42,852,853],{},"问题照片（损坏、障碍物、非标准状况）",[14,855,856],{},[35,857,858],{},"详细说明：",[39,860,861,864,867],{},[42,862,863],{},"记录任何偏离任务要求的情况",[42,865,866],{},"记录超额/不足消耗的原因",[42,868,869],{},"记录问题以备将来参考（如门锁关闭、许可证缺失、天气状况）",[14,871,872],{},[35,873,874],{},"尽可能关联任务：",[39,876,877,880,883],{},[42,878,879],{},"便于追踪任务进度",[42,881,882],{},"支持空间分析（工作集中区域）",[42,884,885],{},"优化未来任务估算",[14,887,888],{},[35,889,890],{},"响应验证结果：",[39,892,893,896,899,902],{},[42,894,895],{},"及时审查验证结果",[42,897,898],{},"如有疑问，提供说明",[42,900,901],{},"在后续报告中修正错误",[42,903,904],{},"从质量反馈中汲取经验",[18,906,907],{"id":907},"报告不可变性",[14,909,910,913],{},[35,911,912],{},"软删除：","\n报告可标记为已删除但保留在数据库中：",[39,915,916,919,922,925],{},[42,917,918],{},"保留交易记录（消耗交易仍存在）",[42,920,921],{},"维持付款审计追踪",[42,923,924],{},"可配置保留期限（应用设置）",[42,926,927,928,931],{},"需 ",[221,929,930],{},"viewDeleted"," 管理员权限查看已删除报告",[14,933,934,937],{},[35,935,936],{},"编辑限制：","\n验证完成后：",[39,939,940,943,946,949],{},[42,941,942],{},"报告转为只读状态",[42,944,945],{},"修改需创建新报告并附备注",[42,947,948],{},"保持质量控制完整性",[42,950,951],{},"版本历史记录追踪所有验证前的变更",[14,953,954],{},[35,955,956],{},"审计追踪：",[39,958,959,962,965],{},[42,960,961],{},"每份报告的编辑均有日志（编辑者、时间、修改内容）",[42,963,964],{},"消耗交易不可编辑（不可篡改）",[42,966,967],{},"付款计算可追溯至原始报告数据",{"title":223,"searchDepth":969,"depth":969,"links":970},2,[971,972,973,974,975,976,977,978,979,980,981,982,983],{"id":20,"depth":969,"text":20},{"id":118,"depth":969,"text":118},{"id":182,"depth":969,"text":183},{"id":229,"depth":969,"text":230},{"id":332,"depth":969,"text":332},{"id":400,"depth":969,"text":400},{"id":504,"depth":969,"text":504},{"id":561,"depth":969,"text":561},{"id":620,"depth":969,"text":620},{"id":662,"depth":969,"text":662},{"id":712,"depth":969,"text":712},{"id":802,"depth":969,"text":802},{"id":907,"depth":969,"text":907},"现场工作人员提交报告，记录完成的工作内容、消耗的材料、GPS 位置及照片。提交报告会自动扣减库存并纳入付款计算，无需额外填写纸质文件。","md",{},true,"/zh/user/work-fulfillment/reports",{"title":5,"description":984},"zh/user/work-fulfillment/reports","PeBk_NJdrgR0uunOdaSSQGFYlmjG0ha7-uyOkTApmqo",1780539291412]